Pothole repair work scheduled for Madison Co.

LEXINGTON, Ky. (WTVQ)The Kentucky Transportation Cabinet says that pothole patching with rolling roadblocks is scheduled for Madison County.  The repairs will be in effect for all three lanes of Interstate 75.  The Kentucky State Police will be assisting with the operations.

KYTC says that repairs will be in effect for the southbound lanes of I-75 on March 19th and 20th starting at 10 p.m. until 6 a.m.

Repairs will start again on March 20th at 10 p.m. and go until 6 a.m.

All three lanes will be slowed and/or blocked while crews repair potholes. Traffic will move at a very slow pace and drivers should expect and plan for long delays and seek an alternate route if possible.

Motorists in Kentucky may report a pothole through the following:

o   Toll free:  1-877-FOR-KYTC (1-877-367-5982)

o   Toll free:  1-800 PATCH IT (1-800-728-2448)

Online:  http://transportation.ky.gov/Pages/Report-a-Pothole.aspx

All work is subject to change depending on weather, emergencies and other factors beyond the control of the Department of Highways.

Navigate traffic with KYTC, http://goky.ky.gov, and WAZE, www.waze.com!

https://www.facebook.com/KYTCDistrict7

https://twitter.com/KYTCDistrict7

Categories: Local News

Leave a Reply

Your email address will not be published. Required fields are marked *