New Circle Ramp Closure Rescheduled
LEXINGTON, Ky. (WTVQ) — Kentucky Transportation Cabinet announced a rescheduling of a ramp closure.
Originally scheduled for today, the rain has pushed the reconstruction and widening project of inbound Versailles Road from New Circle Road to May 3 at 10pm, until 5 am on May 4.
The Department of Highways says the closure is necessary for the installation of a temporary barrier wall, and traffic will be shifted to the temporary pavement on the ramp.
NOTE:
When the ramp reopens, traffic configuration and speed limit will be changed.
Leave a Reply