Milling and paving work on Man o’ War Blvd. begins Tuesday evening

LEXINGTON, Ky – (WTVQ) – Officials say they will begin milling and paving work on Man o’ War Boulevard Tuesday at 6 p.m.

The work will run between 6 p.m. and 6 a.m. and will cause the roadway to be reduced to one lane in each direction for several weeks.

They say the work will begin on the stretch between Nicholasville Road and Grassy Creek and then move to the section between Richmond Road and Beaver Creek.

Both inner and outer loops of both sections will be milled and then repaved.

 

Categories: Featured, Local News

Leave a Reply

Your email address will not be published. Required fields are marked *