Traffic Alert: Paving work scheduled on Man O’ War
LEXINGTON, Ky. (WTVQ) – Road crews are scheduled to begin milling and paving both sides of Man O’ War Boulevard in Lexington between Beaver Creek Road and Tates Creek Road from April 22 through May 5, according to the city.
The resurfacing work is scheduled to begin in the left lane of the inner loop of Man O’ War. The work will be performed nightly from 6:00 p.m. until 6:00 a.m.
Motorists should use caution in the area and be aware of the work crews.
Leave a Reply