Traffic Alert: Lane Closures Scheduled For Winchester Road In Lexington

Lane closures are scheduled along Winchester Road in Lexington (US 60) from Industry Road to Grey Lag/Elkhorn Drive for milling and paving work, according to the Kentucky Transportation Cabinet.

The closures are scheduled from September 2 through September 23 from 7:00 p.m. until 6:00 a.m.

One lane in each direction was scheduled to remain open during the road work.

All work was subject to change depending on weather, emergencies and other factors beyond the control of the Department of Highways.

For up-to-date traffic and travel information in Kentucky, dial 511 or click here.

Categories: Local News, News

Leave a Reply

Your email address will not be published. Required fields are marked *