Lane closure scheduled for the Clays Ferry Bridge on I-75
LEXINGTON, Ky. (WTVQ) – The Kentucky Transportation Cabinet says that a temporary lane closure is scheduled for the Clays Ferry Bridge located on Interstate 75.
The closure is necessary for routine bridge deck repairs to be performed.
KYTC says that the southbound right lane will be closed on Thursday, July 19th from 9 a.m. until 3 p.m. Two lanes will remain opem
All work is scheduled on a tentative basis and is subject to change depending on weather conditions, emergencies and other factors beyond the control of the Department of Highways.
Navigate traffic with KYTC, http://goky.ky.gov, and WAZE, www.waze.com!
https://www.facebook.com/KYTCDistrict7
https://twitter.com/KYTCDistrict7
Leave a Reply