Pothole repair on I-75 South early Friday morning

0
289
Pothole sign

LEXINGTON, Ky. (WTVQ) – The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled pothole repair operations. Rolling road blocks will be used for the work.

Friday, April 16 – 12 a.m. (midnight) until 6 a.m. (6 hours)

- Advertisement -

Interstate 75 – Southbound

Pothole repair work will be in effect for the following locations:

  • operations will be located on the southbound side between milepoints 100 and 106

The traveling public should expect delays during the hours of scheduled repair operations.

All work, and closures are scheduled on a tentative basis, and subject to change depending on weather, emergencies, and other factors beyond the control of the Department of Highways.