Traffic Switched To Westbound Lanes On U.S. 60 In Woodford County

Traffic Switched To Westbound Lanes On U.S. 60 In Woodford County

U.S. 60 traffic in Woodford County will be switched to the westbound lanes today as asphalt work continues along a 7.5 mile stretch to the Franklin County line.
As asphalt work continues on U.S. 60 in Woodford County, drivers should watch for a lane shift June 24th beginning at 1:00 p.m, according to the Kentucky Transportation Cabinet.

The project is a 7.5 mile stretch on U.S. 60 from the Franklin County line to mile point 7.5 in Woodford County.

Two-way traffic is being switched from the eastbound side to the westbound side.

The project is scheduled to be completed on September 15, 2013, according to the Kentucky Transportation Cabinet.
Page: [[$index + 1]]