New Circle Road Bridge Repair Work Set For This Week

Set Text Size SmallSet Text Size MediumSet Text Size LargeSet Text Size X-Large
Share
Updated: 10/13/2013 9:48 pm
Some road work in Lexington could affect your commute this week.

Crews will be doing bridge repair work for the next two days on the inner loop of New Circle Road.

The state says one lane of traffic will be closed between Versailles Road and the Old Frankfort Pike Exit from 9am to 3pm.

And crews will repair the outer loop of New Circle along that same stretch on Wednesday.

The state says repair work will also affect New Circle traffic Thursday and Friday between Nicholasville Road and Tates Creek Road.


Share
Most Popular
2014 36 Blitz: Corbin Redhounds
Perennial power under new leadership with unlikely connection to the program. Video Video
Police: Woman tried to strangle child with rope
Louisville police say a woman contemplated killing an 8-year-old boy then tried to strangle him with a rope.
Arrest Made In Elderly Man’s Death
A couple of weeks ago an elderly man was brutally beaten to death at his Lexington apartment on Appian Way. Video Video
Postal Facility In Lexington Scheduled To Be Closed In 2015
The U.S. Postal Service's processing and distribution center on Nandino Boulevard in Lexington is scheduled to be closed next year to save money, according to the USPS Website. Video Video
Homemade Explosive Device Goes Off At Lafayette HS
Around 8:30 AM Wednesday an explosive device made out of a soda bottle went off. Nobody was injured. Police found two more devices, and depressurized them. Video Video
Inergize Digital This site is hosted and managed by Inergize Digital.

WTVQ.com supports children's privacy rights. All persons under the age of 13 MUST have parental permission to use this website and direct parental supervision is strongly recommended.