Milton-Madison Bridge Demolished

Set Text Size SmallSet Text Size MediumSet Text Size LargeSet Text Size X-Large
Share
Updated: 7/23/2013 6:03 pm
Workers demolished a 700-foot section of the old Madison-Milton bridge over the Ohio River today.  The controlled explosive demolition happened just after 9:00am.

Several roads in the area were closed right before the demolition to comply with a 1,000 foot safety perimeter, including the new $100 million dollar Ohio River Bridge.
Share
0 Comment(s)
Comments: Show | Hide

Here are the most recent story comments.View All

No comments yet!
Most Popular
Car Flips After Collision In Downtown Lexington
A car ended up on its top Sunday afternoon in downtown Lexington. And investigators said they were getting different reports about how it happened. Video Video
Lexington PD: Man Goes to Meet Woman, Gets Robbed Instead
A Frankfort man was hoping to meet up a woman he had met online early Saturday morning, but officials said when he got to their meeting spot, he was robbed.
Police: Gun Fired Outside Lexington Waffle House
Lexington Police were called to a Waffle House restaurant after reports of gunfire. Officers said it happened around 3:00 a.m. Sunday on Redding Road off of Tates Cre
UPDATE: New Details In Shooting On Hollow Creek Road
There were new details released after a shooting that police said left a bullet lodged in a Lexington home.
Deputies: Drugs, Cash & Guns Found In Frankfort Home
A Frankfort man was arrested after deputies say he was caught with drugs, cash and several loaded guns.
Inergize Digital This site is hosted and managed by Inergize Digital.

WTVQ.com supports children's privacy rights. All persons under the age of 13 MUST have parental permission to use this website and direct parental supervision is strongly recommended.